Peterseim Blog - By clicking on the Peterseim logo your directed to the homepage
7 March 2011

Peterseim invests 130,000 EUR in refurbishment of the pickling and washing plant

At Peterseim we have traditionally attached great importance to investments, which are seen as valuable building blocks for safeguarding the future. Continuous technical improvements, especially for maintaining a consistent standard in the precision and quality of seamless drawn tubes and tube products, are part of our constant process.

At the beginning of 2011, some 130,000 EUR were invested in the refurbishment of the pickling and washing plant. The new pickling and washing basins leap to the eye; however  the refurbishment work, which is not immediately visible, is even more interesting. It includes complete refurbishment of the concrete of the pickling bunds and the surrounding area, including the application of a special coating which prevents permanently the penetration of liquids into the concrete. The tubes for the heating circuit and the fresh water supply have been replaced by new installations which comply with the latest environmental protection standards.

Now the pickling and washing operations in the production process can be carried out safely, reliably and cleanly. This applies to both product quality and environmental protection, two very important areas which are in harmony in our company.

You can leave a response, or trackback from your own site.

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URL

Leave a comment

Powered by WordPress